Pengaruh intermittent cost Pembangkit Listrik Tenaga Surya (PLTS) on grid photovoltaic farm pada sistem kelistrikan menggunakan model IEEE 7 bus

Indrawan, Muhammad Rifqi (2018) Pengaruh intermittent cost Pembangkit Listrik Tenaga Surya (PLTS) on grid photovoltaic farm pada sistem kelistrikan menggunakan model IEEE 7 bus. Diploma thesis, UIN Sunan Gunung Djati Bandung.

[img]
Preview
Text (COVER)
1_cover.pdf

Download (108kB) | Preview
[img]
Preview
Text (ABSTRAK)
2_abstrak.pdf

Download (104kB) | Preview
[img]
Preview
Text (DAFTAR ISI)
3_daftarisi.pdf

Download (63kB) | Preview
[img]
Preview
Text (BAB I)
4_bab1.pdf

Download (370kB) | Preview
[img] Text (BAB II)
5_bab2.pdf
Restricted to Registered users only

Download (924kB) | Request a copy
[img] Text (BAB III)
6_bab3.pdf
Restricted to Registered users only

Download (168kB) | Request a copy
[img] Text (BAB IV)
7_bab4.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text (BAB V)
8_bab5.pdf
Restricted to Registered users only

Download (609kB) | Request a copy
[img] Text (BAB VI)
9_bab6.pdf
Restricted to Registered users only

Download (102kB) | Request a copy
[img] Text (DAFTAR PUSTAKA)
10_daftarpustaka.pdf
Restricted to Registered users only

Download (178kB) | Request a copy

Abstract

PLTS merupakan pembangkit listrik yang mengubah energi surya menjadi energi listrik. PLTS bersifat intermittent, saat PLTS masuk kedalam sistem maka akan ada pembangkit eksisting yang sebelumnya telah beroperasi bergeser nilai investasinya, baik nilai Net Present Value (NPV), Internal Rate of Return (IRR) maupun Pay Back Period (PBP). Pergeseran nilai investasi ini yang disebut dengan intermittent cost. Penelitian ini difokuskan untuk memodelkan intermitten cost, dan menghitung dampak pada Biaya Pokok Pembangkitan (BPP) listrik serta pengaruhnya pada tarif listrik. Metode yang digunakan dalam penelitian intermittent cost ini menggunakan economic dispatch. Metode ini menghasilkan dua buah keluaran, pertama perubahan BPP dan yang kedua perubahan fisbilitas pembangkit eksisting. Berdasarkan hasil simulasi diperoleh, pertama ialah dengan masuknya PLTS kedalam sistem mengakibatkan turunnya rata-rata BPP sebesar 91 sen. Kedua perubahan fisibilitas pembangkit eksisting pada PLTGU nilai investasinya menurun, meliputi NPV PLTGU turun sebesar Rp. 35,801,019,664, IRR turun sebesar 2 % dan PBP tetap 5 tahun. Solar Power Plant is a power plant which convert solar energy into electrical energy. Solar Power Plant is intermittent, which means when Solar Power Plant installed into a system, there will be shift of investment value from previous existing power plant, such as Net Present Value (NPV), Internal Rate of Return (IRR), or Pay Back Period (PBP). This shift of invesment value is called intermittent cost. This research is focused on modelling intermitten cost, calculate the effect from electrical generation cost and also influence on electricity rates. The methode which used in this intermittent cost research is economic dispatch method. This method produce two outcome, first is a change in electrical generation cost and second is existing power plant feasibility. The result of this research are, first, installation of solar power plant into a system caused decreasing of average generation cost by 91 cent. Second, change of existing power plant feasibility on combined-cycle power plant (PLTGU) caused decline of investment value, such as NPV PLTGU down Rp 35.801.019.664,- IRR dropped by 2% and the 5 year fixed PBP.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Solar Power; Intermittent Cost; Economic Dispatch
Subjects: Engineering > Management of Engineering
Divisions: Fakultas Sains dan Teknologi > Program Studi Teknik Elektro
Depositing User: Mr Muhammad Rifqi Indrawan
Date Deposited: 09 Oct 2018 03:25
Last Modified: 09 Oct 2018 03:25
URI: https://digilib.uinsgd.ac.id/id/eprint/15186

Actions (login required)

View Item View Item