Lesmana, Yayang Dika (2016) Analisis penyesuaian besaran arus fuse cut out pada penyulang guntur di PT PLN (Persero) distribusi Jawa Barat dan Banten. Diploma thesis, UIN Sunan Gunung Djati Bandung.
|
Text (COVER)
1_cover.pdf Download (190kB) | Preview |
|
|
Text (ABSTRAK)
2-ABSTRAK.pdf Download (196kB) | Preview |
|
|
Text (DAFTAR ISI)
3-DAFTAR ISI.pdf Download (297kB) | Preview |
|
|
Text (BAB I)
4_BAB I.pdf Download (330kB) | Preview |
|
Text (BAB II)
5_BAB II.pdf Restricted to Registered users only Download (893kB) |
||
Text (BAB III)
6-BAB III.pdf Restricted to Registered users only Download (311kB) |
||
Text (BAB IV)
7_BAB IV.pdf Restricted to Registered users only Download (453kB) |
||
Text (BAB V)
8_BAB V.pdf Restricted to Registered users only Download (604kB) |
||
Text (BAB VI)
9_BAB VI.pdf Restricted to Registered users only Download (302kB) |
||
Text (DAFTAR PUSTAKA)
10_DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (300kB) |
Abstract
INDONESIA: Salah satu bagian dari sistem distribusi tenaga listrik yang sangat penting dari Gardu induk Garut ke Gardu distribusi yaitu Penyulang Guntur. Dalam operasi sistem tenaga listrik sering terjadi gangguan-gangguan yang dapat mengakibatkan terganggunya penyaluran tenaga listrik ke konsumen. Gangguan yang sering terjadi dalam sistem distribusi jaringan tegangan menengah 20 kV adalah gangguan hubung singkat dan gangguan beban lebih (over load). Salah satu proteksi yang digunakan untuk menjaga agar gangguan tersebut tidak meluas dan tidak mengganggu daerah yang sehat adalah Fuse Cut Out. Pemilihan fuselink yang tepat sesuai dengan beban yang terpasang pada lapangan, sesuai dengan perhitungan total arus pada setiap percabangan yaitu 85,11 Ampere. Total beban trafo pada setiap percabangan yaitu 2945 kVA, sedangkan total beban trafo pada mineline yaitu 2640 kVA. Fuse cut out mampu menahan arus gangguan sesuai dengan ketentuan dan batas ketahan yang sudah ditetapkan. Semakin kuat arus gangguan maka waktu yang diperlukan trafo untuk bertahan lebih cepat dan singkat. ENGLISH: One part of electricity distribution system that is very important from Garut central Gardu to distribution Gardu is Guntur Feeder. In the operation of electrical power there are frequent distrubances resulting distruption of electrical power supply to consumer. Disorder that often occurs in the medium voltage network distribution system 20 kVA is a short circuit distrubance and over load. One of protection used to keep the disorder not expand and distrubing normal area is fuse cut out. The selection of fuse link that corresponds to the load installed on the area in accordance with the calculation of total flow on each branch is 85,11 amphere. Total load transformer on each branch is 2845 kVA. And total load transformer on the mineline in 2640 kVA. Fuse cut out is able to hold flow disorder accordance with the terms and limits of resistance already in set, the stranger flow disorder makes time required transformer to survive faster and shorter.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Penyesuaian Besaran Arus; Penyulang Guntur; Fuse Cut Out; Trafo |
Subjects: | Applied Physics > Electronics |
Divisions: | Fakultas Sains dan Teknologi > Program Studi Teknik Elektro |
Depositing User: | rofita fita robi'in |
Date Deposited: | 27 Dec 2019 02:24 |
Last Modified: | 29 Jun 2022 02:58 |
URI: | https://digilib.uinsgd.ac.id/id/eprint/26323 |
Actions (login required)
View Item |